Friday, September 3, 2010
|
Scope: For the supply and installation of miscellaneous glass and glass related supplies and services for a one year contract period (with four optional, one year extensions) beginning on or about October 1, 2010, on an "as needed", if needed basis. A pre-bid meeting will be held on August 25, 2010 at 9:00 am.
|
*
|
2:00 PM
|
Glass Repair and Specialty Services - Requirements Contract IFB 11-010
|
Phoenix
|
AZ |
The work to be done consists in general of providing construction area signs, grinding existing road at selected road segments as per details...
|
*
|
2:00 PM
|
HPLU-5958 (047) Keystone Road Improvements
|
|
CA |
A pre-bid conference will be held on August 19, 2010 at 2:00 pm. Contractor shall provide all necessary labor, equipment, materials, supplies, and administration to clean cracks and joints in the existing bituminous street pavement (including areas along any valley gutters and/or lip of gutters, where applicable), and apply the application of the asphalt-rubber sealant product on an as-needed basis for one (1) year period starting on or about October 1, 2010.
|
*
|
2:00 PM
|
Provide and Apply Asphalt Rubber Crack Sealant IFB 11-016
|
Phoenix
|
AZ |
It is the intention of the District to establish an annual contract with a single vendor to provide rental, leasing, delivery, setup and removal of portable/modular buildings, on site storage containers, along with related services such as relocatable ramps, walkways and covers.
|
*
|
2:30 PM
|
Modular Building & Site Work CSDB 11014
|
Phoenix
|
AZ |
|
Tuesday, September 7, 2010
|
Repair Repair/Re-surface Runway (approximately 37,000ft) at...Any questions regarding the specifications should be submitted to the Contracting Officer, in writing, no later than 14 Jul 2010.
|
*
*
|
12:00 PM
|
FA4877-10-R-0018 Repair/Re-surface Runway
|
Davis-Monthan AFB, AZ
|
AZ |
Pre-bid conference/site visit held August 10, 2010, 9:00 am Local Time. The purpose of this project is to improve the exterior and interior security systems....
|
*
*
*
|
2:00 PM
|
VA25810IB0236 SECURITY MINOR 644-222
|
Phoenix
|
AZ |
There is a mandatory pre-bid meeting beginning at 2:00 p.m. on Tuesday, August 31, 2010 at 2:00 p.m. Rehabilitation...
|
*
*
|
3:00 PM
|
155-09-09 Rehabilitation of single family residence
|
Apache Junction
|
AZ |
There is a mandatory pre-bid meeting beginning at 2:00 p.m. on Tuesday, August 31, 2010 at 2:00 p.m. Rehabilitation...
|
*
*
|
3:00 PM
|
173-10-03 Rehabilitation of single family residence
|
Apache Junction
|
AZ |
There is a mandatory pre-bid meeting beginning at 2:00 p.m. on Tuesday, August 31, 2010 at 2:00 p.m. Rehabilitation.
|
*
*
|
3:00 PM
|
300-10-03 Rehabilitation of single family residence
|
Apache Junction
|
AZ |
Pre-bid conference is Friday, August 20, 2010 at 9:00 a.m. Reservoir Liner Replacement...
|
*
*
*
|
4:00 PM
|
110024 Martin B-C Zone Reservoir Liner Replacement
|
Tucson
|
AZ |
The scope of work includes, but is not limited to the following items. Demolition of windows, doors and Hardware, walls, ceilings; new plumbing fixtures and restroom accessories...
|
*
*
*
|
4:00 PM
|
FA4877-10-R-0014 Repair LRS Admin Facility
|
Tucson
|
AZ |
The Owner is soliciting quotes (RFQ) for demolition/removal services to relocate a 8,000 lb. Chem Stor hazardous materials building and the demolish of a 2600 sq. ft. building containing high levels of lead based paint. Both buildings are located at the Palisades Ranger Station on Mt. Lemmon Highway. A site visit is scheduled for August 17, 2010, at 9:00 am.
|
*
|
4:30 PM
|
Palisades Shop Demolition R3-05-10-037
|
Tucson
|
AZ |
|
Wednesday, September 8, 2010
|
The Owner is seeking to procure contractors, licensed in the state of Arizona to provide for the removal of old carpet and to provide and install new carpet. The preferred carpet is carpet squares. A MANDATORY pre-bid walk through will be conducted Wednesday, August 25, 2010, meeting at 10:00 AM.
|
*
|
12:00 PM
|
West Yavapai Guidance Clinic Carpet Replacement
|
Flagstaff
|
AZ |
The Owner is seeking to procure contractors, licensed in the state of Arizona to provide for the installation of a new energy efficient HVAC system, ducting, and chase installation. A MANDATORY pre-bid walk through will be conducted Wednesday, August 25, 2010, meeting at 11:00AM.
|
*
|
12:00 PM
|
West Yavapai Guidance Clinic Quadplex HVAC
|
Flagstaff
|
AZ |
It is the intention of the School District to purchase plumbing repairs and service. The exact quantities and expenditures for plumbing needs are unknown. This work will be to service and/or repair any drains having problems within the School District. Additional work may involve installing or remodeling new plumbing on existing or new buildings.
|
*
|
1:00 PM
|
Plumbing Repairs and Service Bid 11-17-15
|
Marana
|
AZ |
NOTE: All contractors bidding as the prime bidder on this project must be pre-qualified with Division of Facilities Management to bid this project. For instructions on prequailifcation go to http://www.da.ks.gov/fp/contractor/default.htm
To be listed as a confirmed bidder you must click on the
"Plan Holders" link at the right top of the page. Then click on the "Add me to the confirmed bidders list" link.
Budget: $425,000
Architect: Don Schultz
Division of Facilites Management
|
*
*
*
|
2:00 PM
|
A-011399 Norton Subarea Bay Addition
|
Norton
|
KS |
The Owner is accepting statement of qualifications from qualified firms to provide Design and Construction Management of Multiple Vadose Zone Recharge Wells. These wells and an abandoned residential home remediation project are all located at our SPA 1 Water Reclamation Facility. Principals of interested firms must be properly licensed and/or registered to provide the requested services in the State of Arizona. A pre-submittal conference will be held on August 16, 2010 at 1:30 pm.
|
*
|
2:00 PM
|
SPA-1 WRF Plant Vadose Zone Recharge Wells COS11-004
|
Surprise
|
AZ |
It is the intent of the Owner to select a contractor for the construction of the New Incubator Building of approximately 12,000 square feet at Gateway Community College. Work will include laboratory research space, including wet and dry science labs and support space, which will be available for rent at an affordable rate by start-up bioscience companies. The facility will also include office and meeting spaces with required support areas. There will be a non-mandatory pre-bid meeting at 10:00 am, Wednesday, August 25, 2010.
|
*
*
|
3:00 PM
|
NEW INCUBATOR BUILDING IFB 3015-7
|
Phoenix
|
AZ |
The Owner desires to contract with an energy performance company or companies for the output of solar power arrays to be installed on the rooftops of University buildings and on University land. The successful contractor(s) will install and maintain the solar arrays, and the University will pay for the power so generated.
|
*
|
3:00 PM
|
Solarizing ASU Campus-Phase IV RFP NO. 241103
|
Tempe
|
AZ |
A pre-submittal conference is scheduled on August 24, 2010 at 9:00 a.m. The Owner requests Statements of Qualifications from qualified Designer to provide design services for CM@Risk project. The designer will be responsible to design, document and manage construction of a natural lake system to meet the PDP requirement for Continuum.
|
*
|
4:00 PM
|
RFQ DESIGN SERVICES FOR LAKES COMPONENT FOR CONTINUUM AT PRICE CORRIDOR, PB10-01
|
Chandler
|
AZ |
SITE VISIT held Wednesday, 1 September 2010 at 10:00 AM (Mountain Standard Time), The contractor shall furnish all plant, labor, materials, tools, equipment, supplies and supervision to provide the Fire Suppression Systems....
|
*
|
4:00 PM
|
W9124N10T0155 Fire Suppression System
|
Mesa
|
AZ |
|
Thursday, September 9, 2010
|
The Owner wishes to enter into a contract with a qualified firm to perform Construction Manager at Risk Services as outlined in the RFQ documents. The Construction Manager at Risk Contractor (CM @ Risk Contractor) is responsible for the successful, timely and economical completion of the construction project. This construction management project is known as the Construction of the New Multi-purpose Facilities .The facilities are to be a total of approximately 21,000 gross square feet.
|
*
|
11:00 AM
|
CM@Risk Multi Purpose Facility RFQ
|
Rimrock
|
AZ |
The Owner will accept bids from Arizona licensed contractors, either general or specialty, to provide residential rehabilitation at a 12 unit residential complex located in Cottonwood, AZ. Activities will include fencing, security lighting, and low flow toilets. A MANDATORY pre-bid meeting will be held at 10:00 a.m. on Thursday, August 26, 2010.
|
*
|
12:00 PM
|
Rio Verde Condos Fencing, Toilets, Security Lighting 151-10
|
Cottonwood
|
AZ |
Construction of an approximately 9,476 sf Mini Mall with Gas and 4 Multi Purpose Dispensers (MPD’s) a Barber and Two (2) Food concepts: Burger King & Subway.
|
*
*
|
1:00 PM
|
AAFES Ft. Bliss Mini Mall #4
|
Ft. Bliss
|
TX |
A prebid conference will be held on August 17, 2010 at 9:30 a.m. A site visit will be held August 18, 2010 at 9:00 a.m. The work consists of the installation in a metal enclosure.
|
*
*
|
2:00 PM
|
602007 Power Measurement Monitor Installation - Phase V
|
Las Vegas
|
NV |
NOTE: All contractors bidding as the prime bidder on this project must be pre-qualified with Division of Facilities Management to bid this project. For instructions on prequailifcation go to http://www.da.ks.gov/fp/contractor/default.htm
To be listed as a confirmed bidder you must click on the "Plan Holders" link at the right top of the page. Then click on the "Add me to the confirmed bidders list" link.
Budget: $425,000
Architect: Don Schultz
Division of Facilities Management
|
*
*
*
|
2:00 PM
|
A-011400 Atwood Subarea Bay Addition
|
Atwood
|
KS |
Demolition, Layout & Staking, Termite, Landscaping, Earthwork & paving.......
|
*
*
|
2:00 PM
|
Discount Tire
|
Show Low
|
AZ |
Remodel...
|
*
*
|
2:00 PM
|
Fry's 138 Retail Shop Remodel
|
Tucson
|
AZ |
Notice is hereby given that sealed bids will be received by the Owner for construction of Pueblo High School-Reclaimed Water Conversion. A Pre Bid Meeting will be held on August 24, 2010 at 1:00 pm.
|
*
*
|
2:00 PM
|
Pueblo High School-Reclaimed Water Conversion BID 11-55-11
|
Tucson
|
AZ |
Pre-bid conference held August 26, 2010 at 10:00 AM. Owner will receive closed bids for the furnishing of all labor, material, equipment and services for the construction of a Project.
|
|
2:00 PM
|
ROOFING REPLACEMENT
|
City of Yuma
|
AZ |
Wastewater Reclamation Plant Air/Solar Drying Bed Improvements...
|
*
*
*
|
2:00 PM
|
Wastewater Reclamation Plant Air/Solar Drying Bed Improvements
|
Sedona
|
AZ |
The Owner is seeking a qualified construction manager/general contractor to provide design phase assistance and project construction services as the Construction Manager at Risk (CMAR) for sewer and manhole rehabilitation at numerous locations throughout the City. Construction is anticipated to begin in December 2010 and scheduled to be complete by June 2011. There will be a pre-submittal conference on September 2, 2010 at 10:30 a.m.
|
*
|
4:00 PM
|
SEWER & MANHOLE REHABILITATION PHASES I & II, CM@Risk
|
Glendale
|
AZ |
|
Friday, September 10, 2010
|
The Owner is requesting sealed RFQ’s from qualified vendors registered in the State of Arizona for: ARCHITECTURAL AND ENGINEERING SERVICES RFQ #10-1-15.
|
*
|
10:00 AM
|
ARCHITECTURAL AND ENGINEERING SERVICES RFQ #10-1-15
|
Queen Creek
|
AZ |
A Site Visit is to be scheduled August 30, 2010 at 10:00am local time. 10,500 Square Feet (SF), the Maintenance Hangar is approximately 21,200 SF and the Storage Hangar is approximately 15,300 SF. Demolition of existing site improvements...
|
*
*
*
|
12:00 PM
|
HSBP1010R0077 Uma Hangar Complex
|
Yuma
|
AZ |
This project will consist of bridge deck replacement on project AZ BOR CIBR 900(1),...
|
*
*
|
1:00 PM
|
DTFH68-10-B-00024 Monolith Garden Trailhead
|
100 miles north of Yuma, AZ, Mohave County
|
AZ |
Pre-bid Conference to be held onsite at Black Canyon Lake dam August 31, 2010. Construction Modifications.
|
*
*
|
3:00 PM
|
AGFD11-00000153 Dam & Spillway Modifications
|
|
AZ |
The Owner desires to contract with no more than three firms to provide chain link, wrought iron and other types of fencing to its members on a job order basis. The work will include design, installation, repair, and alteration of a wide variety of fencing for educational, other government and not for profit agencies. Work shall be performed at various locations statewide. Street addresses and physical job site locations are unknown at this time.
|
*
|
3:00 PM
|
Job Order Contracting for Fencing RFQ 10J-0910
|
Kingman
|
AZ |
|
Monday, September 13, 2010
|
Fry's #46 - Fuel Center
|
*
*
|
12:00 PM
|
Frys 46
|
Phoenix
|
AZ |
Bid is for a new wood frame slab on grade, 8,641SF.
|
*
|
1:00 PM
|
City Hall Building
|
Wells
|
NV |
Bid is for a new masonry, slab on grade, 2,194 SF, Pool & Dressing Building.
|
*
|
1:00 PM
|
Pool / Bath House
|
Wells
|
NV |
A Site Visit will be held on September 9, 2010 at 8:00 a.m. Construction includes the project specific site survey and field engineering;...
|
*
|
2:00 PM
|
602055 Communication Tower Installation
|
Coyote Springs
|
NV |
|
Tuesday, September 14, 2010
|
A new high school facility of approximately 162,000 sf. Includes demolition of the existing high school of approximately 174,900 sf and additional smaller building and improvements and/or renovation of several Career Technology and Shop Buildings. Includes Sitework, utilities, and all related work. The project budget is approximately $21,500,000. The project will be bid in four packages: General Works, Mechanical, Electrical, and Combination
|
*
*
|
2:00 PM
|
A New Selma High School
|
Selma
|
AL |
Work will include removal of existing asphalt pavement including base materials, installation of new base material and asphalt...
|
*
|
2:00 PM
|
PW 2009-18 Intersection Improvements
|
Apache Junction
|
AZ |
A Pre-bid meeting is scheduled for 10:00 AM, Local Time, September 1, 2010. The work shall consist of furnishing all labor, materials, equipment and services required for the Watson Road and Lower Buckeye Road Temporary Traffic Signal.
|
*
*
|
2:00 PM
|
Watson Road and Lower Buckeye Road Temporary Traffic Signal CD-0810-IFB-0209
|
Buckeye
|
AZ |
Pre-bid conference (attendance is mandatory) will be held on Thursday, September 9, 2010, at 10:30 am. The work includes track lighting and installation of HVAC system....
|
*
|
3:00 PM
|
Jordan Historical Park Rehabilitation
|
Sedona
|
AZ |
The Owner requests Statements of Qualifications from qualified consultants/contractors to provide design services for Sunset Library Renovations. A pre-submittal conference is scheduled on August 31, 2010 at 11:00 a.m.
|
*
|
4:00 PM
|
Sunset Library Renovation Design Services LI1002-201
|
Chandler
|
AZ |
|
Wednesday, September 15, 2010
|
Pre-submittal Conference will be held on Thursday, September 2, 2010 at 1:00 p.m. The project scope of work for the sample study includes the tasks necessary to prepare a corridor feasibility report.
|
*
|
10:00 AM
|
TT005 Design Services 2010-054
|
|
AZ |
Pre-bid meeting is August 25, 2010 at 2:00 PM Local Tucson Time. The project will involve the construction of sidewalks, paved shoulders, shade landscaping and other safety enhancements along the access roads...
|
*
*
*
|
2:00 PM
|
1100096 TRANSPORTATION ENHANCEMENT PROJECT (4PRDWE)
|
approximately ten miles west of Tucson
|
AZ |
NOTE: All contractors bidding as the prime bidder on this project must be pre-qualified with Division of Facilities Management to bid this project. For instructions on prequailifcation go to http://www.da.ks.gov/fp/contractor/default.htm
To be listed as a confirmed bidder you must click on the "Plan Holders" link at the right top of the page. Then click on the "Add me to the confirmed bidders list" link.
Budget: $518,000
Engineer: Janice Wilson, Morrow Engineering, Inc.
316-942-0402
Architect: Mary Stewart, BWR
|
*
*
*
|
2:00 PM
|
A-011292 Switchgear Building - Medium Voltage Power Distribution System Improvements- Hays
|
Hays
|
KS |
The Owner is requesting qualifications for a Construction Manager at Risk for the new District Administrative Compound. The two-story, approximately 30,000 square foot building will include District administrative offices; Facilities offices, storage and garages; and Council, meeting rooms and other public spaces. A Pre-Proposal Conference will be conducted for those interested in the project on September 2, 2010 from 9:00 AM to 12:00 PM MST.
|
*
|
2:00 PM
|
CM@R Administrative Compound
|
Tucson
|
AZ |
Pre-bid conference/site visit will be held on September 7, 2010 @ 1:00 pm. Provide service and inspection..
|
*
|
2:00 PM
|
M10-0044 Chillers/Boilers
|
Marana
|
AZ |
Notice is hereby given that sealed Statement of Qualifications will be received by the Owner for SOQ S-09-10-C009 On-Call Engineering Services. Firms specializing in one or more of the following service areas are encouraged to submit Statement of Qualifications. Required services include, but not limited to design of: Roadway, Traffic, Hydraulics, Hydrology, Contract/Construction Management, Survey/Mapping, Geotechnical, Aerial Mapping, Structural, Utility Design Engineering projects, or other special investigations and projects.
|
*
|
2:00 PM
|
On-Call Engineering Services SOQ S-09-10-C009
|
Nogales
|
AZ |
There is no pre-bid conference for this project for the r?emoval of the Pima Wash fan.
|
*
|
3:00 PM
|
PW1480 Bridgewater Channel Dredging
|
Lake Havasu City
|
AZ |
No pre-bid conference will be held for this project. This project consists of improvements to the Water Booster Station 1,...
|
*
*
|
3:00 PM
|
WT6000 Water Booster Station 1 Replacement
|
Lake Havasu City
|
AZ |
Pre-proposal conference date i s September 7, 2010 at 1:30 P.M. Local AZ Time. The Owner is seeking proposals from qualified and experienced firms to plan, design, fabricate and
install interpretive education exhibits and signage
|
*
|
4:00 PM
|
110047 Interpretive Elephant Exhibit
|
Tucson
|
AZ |
|
Thursday, September 16, 2010
|
The Owner hereby invites your firm to submit a sealed technical and qualification proposal to provide professional architectural and engineering services to design the High School Prep Academy.
|
*
|
10:00 AM
|
Architect And Engineering Services RFP 97-11
|
Chandler
|
AZ |
A MANDATORY pre-bid meeting will be held at 1:30 p.m. on Thursday, September 2, 2010. The Owner will accept bids from Arizona licensed contractors to provide improvements to the Verde Valley Senior Center. Activities will include building a shed, ADA improvements to a stage, ADA door opener, window coverings, visual projection equipment, and landscaping. Davis Bacon Wages are required for this project.
|
*
|
12:00 PM
|
Verde Valley Senior Center Improvements
|
Cottonwood
|
AZ |
Removal of Storm Water Sampling Stations from four existing sites, removal and replacement of Storm Water Sampling Station at one site, and installation of new Storm Water Sampling Stations at four sites, including all appropriate work in accordance with the Approved Plans and Specifications.
|
*
*
|
1:30 PM
|
Storm Water Sampling Stations - 07-036-001
|
Mesa
|
AZ |
A Prebid Conference will be held on August 12, 2010 at 9:00 A.M. The work consists of, but not limited to, the replacement of exhaust fans, repairing leaks, painting....and demolition.
|
*
*
*
|
2:00 PM
|
602004 Spring Mountain Youth Camp Dormitories
|
Las Vegas
|
NV |
Requirement: Furnish all labor, supervison, services, equipment, personnel, materials, supplies, transportation and other incidentials necessary to install a complete operative fire alarm system of the zoned, non-coded general alarm type; the system shall be complete with all necessary hardward, software and memory and shall provide total coverage of the building. THIS PROCUREMENT IS SET-ASIDE FOR THE GEOGRAPHICAL COMPETITION AREA OF TUCSON AND CASA GRANDE, ARIZONA ONLY.
|
*
|
2:00 PM
|
Installation of a Fire Alarm System RMH00100110
|
Sells
|
AZ |
Notice is hereby given that the Owner will receive sealed bids for construction of Sabino and Sahuaro High Schools Stadium Bleacher Replacement /Renovation BID NO. 11-56-11. A Pre Bid Meeting will be held on September 2, 2010 at 10:00 AM LOCAL TIME.
|
*
*
|
2:00 PM
|
Sabino and Sahuaro High Schools Stadium Bleacher Replacement /Renovation 11-56-11
|
Tucson
|
AZ |
The principal components of work under this solicitation include the following: Perform erosion repairs at 10 locations throughout the Farm;Construct riprap drop structures at 5 locations;Re-route overflow drainage at 2 pressure reducing valve (PRV) tanks;Construct concrete plug inside existing 30-inch diameter concrete pipe at 3 locations;Furnish and place aggregate base material on 2 existing roadways;Remove, ship to manufacturer for repairs, and re-install 3 existing flow-meters;Re-establish existing systems monitoring computer program and equipment for the existing farm irrigation system;Test existing cathodic protection system and relocate 1existing test station;Electrical, mechanical, and civil modifications to existing High Pressure Pipeline vault;Furnish and install 2 "STOP" signs;Modify existing buried valve operation access pipe;Remove, repair, and relocate existing triangular barrier;Modify existing pipe equipment in existing PRV Tank 10+94 vault;Furnish and install a sump pump with associated electrical and mechanical appurtenances in 4 existing PRV tank vaults;Coat existing aluminum covers for vaults and pull boxes;Apply Rigid Urethane Roof Installation to existing vault covers;Furnish spare parts for various Farm and vault equipment; andPerform various fence and gate repairs; install new gate. REMINDER THIS IS HUBZONE SET-ASIDE and certification of HUZONE status will be required from the Small Business Administration prior to award.
|
*
*
|
2:00 PM
|
San Xavier Farm Rehabilitation R10PS32080
|
Tucson
|
AZ |
The project generally consists of demolition and removal of the existing 0.1 MG steel tank and appurtenances including lead abatement, and construction of a 0.5 MG welded steel or glass-fused-to-steel bolted water storage tank and appurtenances, DIP water main and connection, access driveway and storm drainage improvements, and testing and disinfection of reservoir and new water main. A PRE-BID MEETING will be held on September 1, 2010 at 10:00 am.
|
*
*
|
2:00 PM
|
Zone 24 Reservoir Replacement Project
|
Prescott
|
AZ |
Construct an approximately 3,000 SF pre-engineered building (PEB).
|
*
|
2:30 PM
|
FA4861-10-R-A022 Construct Base Defence Operations Center (BDOC)
|
Indian Springs
|
NV |
Mandatory pre-bid conference is scheduled for 10:00 A.M., Thursday, September 2, 2010. adjust one (1) sanitary sewer manhole rim and cover, relocate existing street light and rework landscaping and irrigation on the north side....
|
*
*
|
3:00 PM
|
2010-010 Intersection Improvements
|
Marana
|
AZ |
A MANDATORY PRE-BID CONFERENCE IS SCHEDULED FOR 10:00 A.M., THURSDAY, SEPTEMBER 2, 2010. Intersection Improvements.
|
*
*
|
3:00 PM
|
2010-153-025 INTERSECTION IMPROVEMENTS
|
Marana
|
AZ |
This agreement will provide the Transportation department, with painting services for streetlight poles and associated equipment on an as needed basis for a one (1) year period.
|
*
|
3:00 PM
|
Streetlight Pole Painting Services Project TR0014-10
|
Mesa
|
AZ |
The date and time for the preproposal site visit will be posted here once available. Work will include power, UPS, HVAC, new radio racks, New/Refurbished Radios , two 100 feet self supporting towers with new antennas/coax...
|
*
|
4:00 PM
|
FA8773-10-R-0113 Relocate GATR System
|
Davis Montham AFB AZ
|
AZ |
|
Friday, September 17, 2010
|
A mandatory Pre-Bid Conference will be held at 9/8/2010 @ 2:00PM. Sealed bids are being solicited by the Owner for the furnishing of all labor, material, transportation and services required for Gabaldon Roof Repair, Project #09.001.111.
|
|
2:00 PM
|
Gabaldon Roof Repair, Project #09.001.111
|
Flagstaff
|
AZ |
|
Monday, September 20, 2010
|
An organized site visit has been scheduled for 31 August 2010 at 1330. Work consists, but not limited to Install a box trench running through bays 1-4 and connecting to the oil-water separator.
|
*
*
|
9:00 AM
|
FA4861-10-R-A016 Maintenance Facility, Bldg.
|
Las Vegas
|
NV |
The intent of this Request for Proposal is to establish a one (1) year service contract with a Landscaping firm or contractor with an option to renew for four (4) one (1) year period, who would perform landscaping services as outlined in the scope of work district wide for Creighton and Madison Elementary School District and is on an as needed basis contract.
|
*
|
2:30 PM
|
Landscaping Services CDSP 11015
|
Phoenix
|
AZ |
Services to be performed: Construction and remodel of the existing two-story approximately 48,000 gsf KSC (Kranitz Student Center) and to provide the addition of a new 4000 square feet multi-purpose community meeting room and 3600 square feet of new office space. The scope of work will also include the upgrade of existing building infrastructure and mechanical systems to meet the demands of the increased space. The District intends to construct this project using a construction manager at risk delivery system.
|
*
*
|
3:00 PM
|
CM@RISK FOR THE KRANITZ STUDENT CENTER EXPANSION & REMODEL RFP 3014-7
|
Phoenix
|
AZ |
Owner requests Statements of Qualifications (SOQ) from firms to provide professional land surveying services.
|
*
|
5:00 PM
|
rfq CONSULTING LAND SURVEYING
|
Laughlin
|
NV |
|
Tuesday, September 21, 2010
|
Remodel of Existing Bldg.
|
*
|
11:00 AM
|
Pahrump Valley High School Addition & Remodel
|
Pahrump
|
NV |
Mandatory Pre-bid conference/Site-visit is scheduled for, Thursday August 26, 9:00 AM Mountain time for the Construction of new building.
|
*
*
|
1:00 PM
|
IBM10B0014 Construction of new O&M Building
|
Rio Rico
|
AZ |
NOTE: All contractors bidding as the prime bidder on this project must be pre-qualified with Division of Facilities Management to bid this project. For instructions on prequailifcation go to http://www.da.ks.gov/fp/contractor/default.htm
To be listed as a confirmed bidder you must click on the "Plan Holders" link at the right top of the page. Then click on the "Add me to the confirmed bidders list" link.
Budget: $458,000
Engineer: Dave Lane, P.E.
Brack and Associates Consulting Engineers. P.A
785-271-6644
|
*
*
*
|
2:00 PM
|
A-011398 Emporia State University Power Plant New Chiller
|
Emporia
|
KS |
NOTE: All contractors bidding as the prime bidder on this project must be pre-qualified with Division of Facilities Management to bid this project. For instructions on prequailifcation go to http://www.da.ks.gov/fp/contractor/default.htm
To be listed as a confirmed bidder you must click on the "Plan Holders" link at the right top of the page. Then click on the "Add me to the confirmed bidders list" link.
Budget: $153,000
Architect: Don Schultz
Division of Facilities Management
785-291-3992
|
*
*
*
|
2:00 PM
|
A-011488 Olathe Area Office/Shop Reroof
|
Olathe
|
KS |
Sealed bids will be received by the Owner for PIONEER PARKWAY DRAINAGE PROJECT NO. 1018268. There has been a pre-bid meeting scheduled for 1:00 p.m., Monday, September 13, 2010. The scope of work for this project includes furnishing all labor, materials, equipment, fixtures and services required for installation of 6,550 linear feet of edge drains along 3.8 miles of Pioneer Parkway. Work will include saw cutting existing Portland cement and asphaltic concrete; trench excavation; installation of filter fabric, drain aggregate and leach pipe; compaction of trench backfill materials, and placement of Portland cement and asphaltic concrete to match existing improvements. The materials on this project include the following approximate quantities: 18 cubic yards of Portland cement concrete, 169 ton asphaltic concrete, 339 cubic yards of drain aggregate, and 6,550 linear feet of drain pipe, all in accordance with the plans, specifications and contract documents.
|
|
2:00 PM
|
PIONEER PARKWAY DRAINAGE PROJECT 1018268
|
Prescott
|
AZ |
Sealed bids will be received by the Owner for PRESCOTT LAKES PARKWAY ROUNDABOUT PROJECT NO. 1018403. There has been a MANDATORY pre-bid meeting scheduled for 2:00 p.m., Tuesday, September 14, 2010. The scope of work for this project includes furnishing all labor, materials, equipment, fixtures and services required for construction of the Prescott Lakes Parkway Roundabout, to include grading, asphalt paving, curb and gutter, electrical conduit and lighting, installation of water and sewer facilities, storm drain installation, signing and striping, all in accordance with the plans, specifications and contract documents.
|
|
2:00 PM
|
PRESCOTT LAKES PARKWAY ROUNDABOUT PROJECT 1018403
|
Prescott
|
AZ |
The purpose of this request for proposal (RFP) is to contract with a qualified firm that satisfies the needs of the District in the trimming, cutting, and removal of various types and sizes of trees throughout the District.
|
*
|
2:30 PM
|
Tree Trimming, Cutting, And Removal Services RFP 11-018
|
Phoenix
|
AZ |
A Prospective Bidder's Conference and On-Site Inspection will be held on September 2, 2010 at 9:00 A.M. MST. Work includes, but not limited to, excavation, compaction, backfill...
|
*
|
3:00 PM
|
PR10-051 Electrify Campground Sites
|
Maricopa/Pinal
|
AZ |
Pre-submittal is Tuesday, September 14, 2010 at 9:00 A.M., Local AZ Time. Competitive one-step process to retain up to three (3) Contractors for a Job Order Contract (JOC) to provide labor, materials, and some incidental design services relating to the rehabilitation and clean-up of foreclosed homes.
|
*
|
4:00 PM
|
100453 ARRA JOC NSP 2 Housing Rehabilitation
|
Tucson
|
AZ |
|
Wednesday, September 22, 2010
|
A pre-bid conference will be held on September 8, 2010 at 9:00 a.m. This project consists of vacuuming cracks in asphalt concrete surfaced pavements, heating and applying asphalt modified ...
|
*
|
11:00 AM
|
30050089 Crack Seal Project, FY11 2010-056
|
various subdivision roads
|
AZ |
NOTE: All contractors bidding as the prime bidder on this project must be pre-qualified with Division of Facilities Management to bid this project. For instructions on prequailifcation go to http://www.da.ks.gov/fp/contractor/default.htm
To be listed as a confirmed bidder you must click on the "Plan Holders" link at the right top of the page. Then click on the "Add me to the confirmed bidders list" link.
Budget: $168,000
Architect: Mark Reiske, R.A., Associate Director
University of Kansas
|
*
*
*
|
2:00 PM
|
A-011041 Watson Library Partial Reroof
|
Lawrence
|
KS |
NOTE: All contractors bidding as the prime bidder on this project must be pre-qualified with Division of Facilities Management to bid this project. For instructions on prequailifcation go to http://www.da.ks.gov/fp/contractor/default.htm
To be listed as a confirmed bidder you must click on the "Plan Holders" link at the right top of the page. Then click on the "Add me to the confirmed bidders list" link.
Budget: $827,608
Architect: R. Keith Blackburn, AIA
HTK Architects, P.A.
785-266-5373
|
*
*
*
|
2:00 PM
|
A-011324 State Defense Building HVAC Replacement/Office Refurbishment - Phase 4
|
Topeka
|
KS |
NOTE: All contractors bidding as the prime bidder on this project must be pre-qualified with Division of Facilities Management to bid this project. For instructions on prequailifcation go to http://www.da.ks.gov/fp/contractor/default.htm
To be listed as a confirmed bidder you must click on the "Plan Holders" link at the right top of the page. Then click on the "Add me to the confirmed bidders list" link.
Budget: $1,133,000.00
Architect: Vince Mancini, Project Architect
GMCN Architects
620-276-3244
|
*
*
*
|
2:00 PM
|
A-011364 Laundry Building Restoration - LSH
|
Larned
|
KS |
Work will also include the relocation of water valves and lines both by trenching and boring, compacting subgrades and bases and repairing...
|
*
|
2:00 PM
|
FA4877-10-R-0019 Repair (Sustain) Pavements (Air Field)
|
Davis-Monthan Airfields
|
AZ |
Pre-Bid conference held on August 23, 2010 at 9:30 a.m. Work is to include all mechanical, fire sprinkler adjustments, and electrical work associated...
|
*
*
|
3:00 PM
|
ADOT11-00000175 ATRC Tenant Improvement Modifications
|
Phoenix
|
AZ |
Notice is hereby given that the Owner is soliciting bids for the REROOFING OF BUILDING B at the Aravaipa Campus.
|
|
3:00 PM
|
REROOFING OF BUILDING B
|
Coolidge
|
AZ |
A Pre-Bid Conference will be held on September 13, 2010, 1:00 PM, Arizona Time.
New restroom structure (approximately 1,135 square feet).
|
*
*
|
4:00 PM
|
10-C-001 BHC Community Park Restroom
|
City of Bullhead City
|
AZ |
Pre-Bid/Proposal Date: 9/9/2010 1:30:00 PM.
The Owner is seeking experienced Contractors to provide services as described in the SOQ for various projects...
|
*
|
5:00 PM
|
P11-0004 JOC for Commercial Rehabilitation Program
|
Peoria
|
AZ |
|
Thursday, September 23, 2010
|
Provide all site work, well pump, motor, piping, electrical work, 16-inch waterline, 12-inch waterline, 8-inch waterline, block wall, site access road, grading, fiber optic installation, and all appurtenances required to complete the equipping of the well in accordance with the Approved Plans and Specifications.
|
*
*
|
1:00 PM
|
Desert Well 22 Equipping 05-066-002
|
Mesa
|
AZ |
Notice is hereby given that the Owner will receive sealed bids for construction of Sossaman Rd. 10,000 linear feet of 24 Inch Waterline-Santan Freeway to Peralta Ave. Plan Set A; Elliot Rd. 5130 linear feet of 20 Inch Waterline -Power Rd. to Sossaman Rd. Plan Set B. As Shown in the approved plans and specifications
|
*
*
|
1:30 PM
|
Sossaman Rd 24 Inch Waterline, Elliot Rd 20 Inch Waterline
|
Mesa
|
AZ |
Pre-bid Conference will be held on September 8, 2010 at 10:00 a.m. The scope of work for this project includes all material, labor, and equipment for the reinforcing of the existing parking garage...
|
*
|
2:00 PM
|
602045 County Parking Garage: Structural Stabilization
|
Las Vegas
|
NV |
NOTE: All contractors bidding as the prime bidder on this project must be pre-qualified with Division of Facilities Management to bid this project. For instructions on prequailifcation go to http://www.da.ks.gov/fp/contractor/default.htm
To be listed as a confirmed bidder you must click on the "Plan Holders" link at the right top of the page. Then click on the "Add me to the confirmed bidders list" link.
Budget: $2,062,440
Engineer: Sean Miller, MKEC Engineering Consultants, Inc.
316-684-9600, smiller@mkec.com
|
*
*
*
|
2:00 PM
|
A-010718(a) Duerksen Fine Arts Center HVAC System Replacement - Phase II
|
Wichita
|
KS |
NOTE: All contractors bidding as the prime bidder on this project must be pre-qualified with Division of Facilities Management to bid this project. For instructions on prequailifcation go to http://www.da.ks.gov/fp/contractor/default.htm
To be listed as a confirmed bidder you must click on the "Plan Holders" link at the right top of the page. Then click on the "Add me to the confirmed bidders list" link.
Budget: 63,000
Architect: Mark Reiske, R.A.
University of Kansas
|
*
*
*
|
2:00 PM
|
A-011341 Robinson Center Repair Kalwall - KU
|
Lawrence
|
KS |
NOTE: All contractors bidding as the prime bidder on this project must be pre-qualified with Division of Facilities Management to bid this project. For instructions on prequailifcation go to http://www.da.ks.gov/fp/contractor/default.htm
To be listed as a confirmed bidder you must click on the "Plan Holders" link at the right top of the page. Then click on the "Add me to the confirmed bidders list" link.
Budget: $280,000
Engineer: James Scalora, P.E.
Orazem & Scalora Engineering, P.A.
785-537-2553
|
*
*
|
2:00 PM
|
A-011425 Pittman Hall Electrical Improvements - KSU
|
Manhattan
|
KS |
NOTE: All contractors bidding as the prime bidder on this project must be pre-qualified with Division of Facilities Management to bid this project. For instructions on prequailifcation go to http://www.da.ks.gov/fp/contractor/default.htm
To be listed as a confirmed bidder you must click on the "Plan Holders" link at the right top of the page. Then click on the "Add me to the confirmed bidders list" link.
Budget: $640,000
Architect: Keith Blackburn
HTK Architects, P.A.
785-266-5373
|
*
*
*
|
2:00 PM
|
A-011468 State Defense Building Joint Forces Headquarters Server Annex
|
Topeka
|
KS |
Sealed bids will be received by the Owner for Bid# PW10/11/004 Replacement Housing Garner Place. A mandatory pre-bid conference will be held Tuesday September 7, 2010 10:00 am.
|
*
|
2:00 PM
|
Replacement Housing Garner Place PW10/11/004
|
Dudleyville
|
AZ |
Prospective bidders are invited to attend a conference September 15, 2010 at 10:00 a.m., local time. Installation of one (1) new water production well....
|
*
|
3:00 PM
|
PW10-W02 Well Drilling and Installation
|
El Mirage
|
AZ |
The Owner will be accepting sealed proposals for a solar photovoltaic cell grid-tie system, utilizing fixed, 30 degree, top of pole mount construction (approximately 33 kW). A pre-submittal conference will be held on September 9, 2010 at 10:00 am.
|
*
|
3:00 PM
|
Solar Photo Voltaic at Water Reclamation Center RFP
|
Thatcher
|
AZ |
|
Friday, September 24, 2010
|
Scope: Provide all labor, material, and equipment to replace existing fencing with new ornamental tubular steel fencing, in accordance with the specifications and provisions contained within this IFB.
|
*
|
2:00 PM
|
Two Ornamental Tubular Steel Fencing Projects IFB 11-022
|
Phoenix
|
AZ |
Pre-bid Conference is Monday, September 13, 2010 at 1:00 P.M. Local AZ Time. Chiller Replacement Construction...
|
*
|
4:00 PM
|
100539 Court Chiller Replacement Construction
|
Tucson
|
AZ |
|
Monday, September 27, 2010
|
The Owner is seeking bids for the construction of the WESTERN BLVD. STORMWATER MANAGEMENT PROJECT, CIP # E328. This work consists primarily of underground storm drainage systems in existing roadways, including earthwork, culverts, concrete storm sewer, and pavement replacement. A non-mandatory pre-bid conference will be held at 1:30 PM Arizona MST on Monday, September 20, 2010.
|
|
3:30 PM
|
WESTERN BLVD. STORMWATER MANAGEMENT PROJECT, CIP # E328
|
Prescott Valley
|
AZ |
|
Tuesday, September 28, 2010
|
Competitive sealed bids shall be received by the Owner for E. MCMURRAY BOULEVARD MILL AND OVERLAY IMPROVEMENT PROJECT. This project will provide for resurfacing of existing McMurray Boulevard from Henness Road to Pinal Avenue. The project area is approximately 45 feet wide and 16, 500 feet long. Based on coring and Ground Penetrating Radar the existing pavement is 3.5 inches thick from Henness Road to Trekell Road and 5” from Trekell Road to Pinal Avenue. There are approximately 50 water valves, 25 monuments and 25 manholes within the project area that will need to be adjusted by the removal of old concrete collars and replacement with new ones. Asphalt paving will be MAG A 12.5 mm mix placed with the appropriate tack and fog seal coats. With minor modifications the current layout of pavement marking will be reproduced once the repaving is complete.
|
*
|
1:30 PM
|
E. MCMURRAY BOULEVARD MILL AND OVERLAY IMPROVEMENT PROJECT
|
Casa Grande
|
AZ |
|
Thursday, September 30, 2010
|
The Owner will begin accepting bids for several Energy Efficiency projects, funded through ARRA and the Arizona Department of Commerce. These projects include retrofitting of lighting fixtures, installation of energy efficient windows and installation of HVAC systems. A pre-bid meeting has been scheduled for Thursday, September 9th at 10:00 am.
|
*
|
5:00 PM
|
Energy Efficiency Projects
|
St Johns
|
AZ |
|
Friday, October 1, 2010
|
The Owner is seeking qualified Engineering and Architectural Consultants to provide general engineering design and construction administration services. The on call list will be in effect for two years.
|
|
4:00 PM
|
ON CALL CONSULTING SERVICES SOQ
|
Glendale
|
AZ |
|
Tuesday, October 5, 2010
|
Scope: Exterior renovations including patching existing stucco, repairing exterior canopies, downspouts, exterior appurtenances, lighting, exterior painting, rehab 56 exterior windows, install new accessible ramp, install new exterior door, provide new wood flooring, ceiling, duct work, and lighting in 2 exhibit spaces. Add alternates for new flag pole, new roofing and bird control devices. The project has a 15% SBE goal.
|
*
*
|
2:00 PM
|
George Washington Carver Museum Exterior Rehabilitation and Limited Interior Rehabilitation - REBID
|
Phoenix
|
AZ |
The Owner is seeking proposals for civil, electrical, geotechnical, mechanical, and structural engineering services.
|
*
|
3:00 PM
|
Civil, Electrical, Geotechnical, Mechanical, and Structural RFQ P10/9734
|
Tucson
|
AZ |
The City is seeking proposals from qualified firms to provide financing, design and installation, as well as on-going maintenance and operation of a privately owned photovoltaic electric generating system. The City seeks to enter into a Contract with the selected Proposer. A non-mandatory pre-proposal meeting will be held on August 23, 2010 at 10:00 am.
|
*
|
3:00 PM
|
SOLAR PHOTOVOLTAIC ELECTRIC GENERATING SYSTEMS RFP 2010-46
|
Flagstaff
|
AZ |
|
Wednesday, October 13, 2010
|
Perform repair, alteration and construction of various paved roads, parking lots, runways, taxiways,...
|
*
|
2:00 PM
|
W9124R-10-R-0014 MISCELLANEOUS PAVING
|
Yuma
|
AZ |
|
Friday, October 22, 2010
|
Replace Fire and Booster Pump Control System...
|
*
|
1:00 PM
|
IFBP06081000001 FIRE AND BOOSTER PUMP CONTROL SYSTEM
|
Phoenix
|
AZ |
|
Wednesday, December 8, 2010
|
The Owner is seeking proposals for the rehabilitation of a city-owned residential property. The site consists of historic residential structures, located at 50 West Mariposa Street. A pre-proposal meeting will be held on August 16 2010 at 1:00 pm.
|
*
|
2:00 PM
|
Historic Residential Rehabilitation RFP
|
Phoenix
|
AZ |